Stage 1
The deliverables for this stage included:
- Forming a team of 5
- Completing a team contract
- Establishing an online repository
- Creating an online project portfolio
- Coming up with 3 project ideas
Here are the 3 ideas submitted:
- Online Internship Search Engine
- Schedule Builder App
- Informational App for Dog Owners/Lovers
Stage 2
We have officially chosen to create an Informational and Social Media App for Dog Owners and Lovers alike for our group project. At stage 2, we are expected to:
- Identify our project idea
- Identify stakeholders and users
- Conduct two user research methods
The expected stakeholders we have identified consist of:
- Experienced Dog-Owners
- Inexperienced Dog-Owners
- Future Dog-Owners
- The Calgary community at large
- Future Dog-Owners
Stage 3
The main focus for this stage was producing a storyboard, video prototype, and finally, the lo-fi prototype of our Barkipedia app. To complete our deliverables, we followed a specific process that consisted of the steps of:
- Conducting a brainstorming session
- Collaborating on an affinity diagramming session
- Selecting and polishing ideas
- Refining ideas and drawing up a storyboard with our ideas as the basis
- Creating a video prototype presenting our storyboard
- Writing out Task-centered Walkthroughs to identify and address problems
- A written reflection detailing our experience with the stage 3 process
Stage 4
This stage involved generating a Hi-Fi prototype.
The steps taken to convert from the Lo-Fi prototype to the final Hi-Fi prototype include:
- Convert Lo-Fi to intital Hi-Fi
- Sketch each page in the app
- Categorize the pages
- Assign pages for each group member
- Create a general template to keep the design consistent
- Link the pages
- Discover inconsistencies
- Add new pages to deal with inconsistencies
- Repeat the above 3 steps until done
- Converting initial Hi-Fi to final Hi-Fi
- Sent heuristics on our prototype to Group 1.3
- Conducted heuristics on our own prototype
- Created a checklist based on our heuristics
- Sorted checklist based on priority
- Received heuristics from Group 1.3
- Wrote heuristcs report
- Added points we thought valuable from Group 1.3's heuristics to our checklist
- Refine prototype according to checklist, completing based on priority
Heuristic Findings and Fixes
User Story
Stage 5
This was the final stage of the project which revolved around our final version of the Hi-Fi prototype. Additionally, we had to prepare a report and presentation to tie all elements of the project together.